replaced node with block

This commit is contained in:
joe7575 2017-06-06 12:26:11 +02:00 committed by GitHub
parent 210bce25e3
commit d19e401fb5

@ -8,13 +8,13 @@ The size of the crane (which is the working area) can be configured.
## Introduction
* Place the crane base node.
* Place the crane base block.
The crane arm will later be build in the same direction you are currently looking
* Right-click the crane base node and set the crane dimensions in height and width (between 8 and 24 by default).
* Right-click the crane base block and set the crane dimensions in height and width (between 8 and 24 by default).
The crane will be build according to this settings.
* Right-click the crane switch node to place the hook in front of the crane mast
* Right-click the crane switch block to place the hook in front of the crane mast
* Enter the hook by right-clicking the hook
@ -26,7 +26,7 @@ The size of the crane (which is the working area) can be configured.
* Leave the hook by right-clicking the hook or right-clicking the crane switch node
* To destroy the crane, destroy the base node.
* To destroy the crane, destroy the base block.
## To Do: