replaced node with block

This commit is contained in:
joe7575 2017-06-06 12:26:11 +02:00 committed by GitHub
parent 210bce25e3
commit d19e401fb5

@ -8,13 +8,13 @@ The size of the crane (which is the working area) can be configured.
## Introduction ## Introduction
* Place the crane base node. * Place the crane base block.
The crane arm will later be build in the same direction you are currently looking The crane arm will later be build in the same direction you are currently looking
* Right-click the crane base node and set the crane dimensions in height and width (between 8 and 24 by default). * Right-click the crane base block and set the crane dimensions in height and width (between 8 and 24 by default).
The crane will be build according to this settings. The crane will be build according to this settings.
* Right-click the crane switch node to place the hook in front of the crane mast * Right-click the crane switch block to place the hook in front of the crane mast
* Enter the hook by right-clicking the hook * Enter the hook by right-clicking the hook
@ -26,7 +26,7 @@ The size of the crane (which is the working area) can be configured.
* Leave the hook by right-clicking the hook or right-clicking the crane switch node * Leave the hook by right-clicking the hook or right-clicking the crane switch node
* To destroy the crane, destroy the base node. * To destroy the crane, destroy the base block.
## To Do: ## To Do: